We ensure complex investment realization – starting with document preparation, technical support, design preparation, through investor supervision, being substitute investor, investment management up to final financial investment settlement, start up and other activities necessary for final acceptance of the investment.

Budowa gazociągu DN1000 MOP 8,4 Mpa Tworóg-Tworzeń wraz z infrastrukturą towarzyszącą

projects

Construction of a high pressure gas pipeline, DN 1000, MOP 8.4 MPa, between Tworzeń — Tworóg with infrastructure required to operate the pipeline

July 6, 2023

Budowa gazociągu DN1000 MOP 8,4 Mpa Tworóg-Tworzeń wraz z infrastrukturą towarzyszącą

Construction of a high pressure gas pipeline, DN 1000, MOP 8.4 MPa, between Tworzeń — Tworóg with infrastructure required to operate the pipeline

Project value: 112.314.468,00 euro
Investor: Gas Transmission Operator GAZ-SYSTEM S.A.