We ensure complex investment realization – starting with document preparation, technical support, design preparation, through investor supervision, being substitute investor, investment management up to final financial investment settlement, start up and other activities necessary for final acceptance of the investment.

projects

Construction of a high-pressure gas pipeline DN700 with a Maximum Operating Pressure (MOP) of 8.4MPa from Racibórz to Oświęcim, including the necessary infrastructure for its operation, and the construction of the Systemic Reducing and Measuring Station (SSRP) Suszec, along with a DN300 branch. Section L1: SNO Stańkowice – ZZU Ochojec

October 18, 2023

Construction of a high-pressure gas pipeline DN700 with a Maximum Operating Pressure (MOP) of 8.4MPa from Racibórz to Oświęcim, including the necessary infrastructure for its operation, and the construction of the Systemic Reducing and Measuring Station (SSRP) Suszec, along with a DN300 branch. Section L1: SNO Stańkowice – ZZU Ochojec

Investor: GAZ-SYSTEM S.A.